Narrative

Today we opened up the entire EB surface in T20, which was mostly what had been preserved under the rock fall that we removed yesterday. There is a small pit cut into the surface now (pit - locus 109), though we have not finished plumbing its depths, and it so far has only yielded small sherds. We removed the vessel from the surface also, after photographing the entire locus.We also worked on digging toward the eastern terrace wall in T20.103, cleaned rocks and dug in T22.18 (between the two trenches) and tried to delineate the east-west terrace wall further. However, due to wind, we had to stop work at about 2 pm.