Today we worked with shovels just to the north of the terrace wall that bounds T20 and T22, and slowly it's becoming clearer. Locus 103 in T20 is being dug down to a flat level, as we try to get it even with the easternmost terrace wall.We also spent a lot of the day working in the eastern third of the trench, now Locus 111, cleaning the easternmost terrace wall and removing a lot of the dirt and rocks that have collected there over the past two years. It looks far better now, though we're not entirely finished.