Search
Log In
Code
SH08.08
Season
2008
Narrative

07.04.2008 Today we worked especially in Locus 2, on the upper side of the trench. We cleaned the upper side of the natural rock and mixed EB and LB sherds have been found. We also worked in locus 9 (basin), where only one indeterminate sherd has been found. There were two irregular stones in the basin which were probably felt inside the basin from the upper side of the slope. In the lower side the structures are very irregular and are not seem to be a wall or other constructions. The sherds are mixed and we found a lot of felt stones which has been removed. Today we finished one hour soon because we need to go in Ashtarak to celebrate the Independence day and the 10th anniversary of Project Aragats. God bless America and Happy birthday to Project ArAGATS!!!