Search
Log In
Code
SH08.31
Season
2008
Narrative

07.31.2008. After cleaning the locus 2 we found finally a regular straight structure which can be a wall (four straight stones are arranged). The limits of the trench cuts the wall from the two sides. We continued cleaning and the soil became more and more light and clayed when we reached this straight construction level.