Search
Log In
Code
SH08.38
Season
2008
Narrative

08.08.2008 Today was the last day of 2008 season and unhopefully we had rain an 11:50 AM. But luckily we finished before the rain the cleaning of locus 7 and 6. Two stone tools have been found in the clayed soil of locus 7 (which can be the occupation soil). Few felt stones has been removed. The cleaning of Locus 6 revealed the straight stone structure (wall?), and near this wall we found two manos. The 2008 excavations of T24 are finished, but the trench is interesting because of the presence of two wall (north and south), and the vertical natural rock (in east). The stones in western part of the trench are irregular and isolated and are not from a structure.