Search
Log In
Code
EF10.14
Season
2010
Narrative

Today Hasmik came to evaluate the preparations for her work, and helped us whip the walls into shape. We need to do a little more cleaning where WSI and WSI2 meet, to make sure that she can join the two trenches easily, but overall, the walls are almost finished. In addition, we took down the Locus 11, the most productive locus that so far has been hugging the NE wall. We also seem to have found its border with Locus 14, the darker matrix found more in the middle of the room. In general, a productive day.