Search
Log In
Code
AAH.13
Season
2002
Narrative

Today the work is continued in T08 and T09.
T08 - in order to find the continuation of W801 and W802 we have extended the trench on 2,5 m from "northern" side. Here the picture is changed completely. So considered straight W801 curves and with W802 ends joining to another wall - W803 under a right angle. We opened the collapse of the stones very carefully in order to be sure of the real existence of the mentioned new wall. So far that the wall W801 has already on end (and it doesn't extend along the whole terrace, we decided to extend the trench also from "southern" side (2,5x3,5m). Here the situation with the walls is not yet clear.
In T09 the material is still diachronic. There is a range of stones, seemingly a wall.