Sod removal was completed in the early afternoon, after which point I closed the first locus. The second locus extends 2.3 meters from the southeast edge of the trench, and one of its objectives will be to lower this area to even it out with the rest of the trench. At the moment it does look like there is some sort of interior wall about 6m from the southeast edge of the trench, but we'll see.