Began the day by cleaning the top of the NE-SW running wall in T32. I had meant to take measurements for the top of this wall and enter it into the database as a feature today, but the wind whipped up so much this morning that it was really impossible to do any drawing without really dirtying the pages of my notebook, so I'll have to do this tomorrow in the morning before it gets windy (and hopefully it won't be like today and get windy at 10 AM). In any case, we spent the first part of the morning cleaning the wall (which I made L10), and then eventually began a new pass from the edge of T32 (where it borders T27 in the E), which is L11. In this pass we exposed the top of a large, broken storage vessel, found a three "jar-stoppers" and a stone tool. Towards the end of the day we lifted the three small jars we found yesterday because in L11 we had reached the wall, and it was clear that these three vessels were not sitting on a floor. We'll continue L11 tomorrow, and perhaps even begin another pass (L12?).