Relatively slow day on site today as we're both cleaning the T27/T32 extension and also continued to excavate T34, still in L02. In the T27/T32 extension we have simply cleaned a number of stones and exposed an area very similar to the downslope portion of T27. This presents some difficulty as it is hard to know which stones to remove and which to leave in place. Tomorrow we'll continue to clean and eventually begin removing stones that seem to be fallen/tumble. In T34 we've excavated approximately 30 cm in some places and are continuing through a wash layer. In the NW corner of the trench there are some rocks appearing and there are indications of bedrock, but the rest of the trench seems to continue down-- this is a bit surprising considering the fact that T33 was shallow before reaching bedrock, but it's possible that the bedrock dives away in the southern half of the trench. Time will tell.