Much of the day was spent cleaning the feature in 29, and the NW 9.33m of the trench in general (note: this area called locus 35 on 8/1/11). Unfortunately it looks unlikely that we'll be able to take the whole trench down to the floor -- the rear (SE) 5.67m is probably too big a task for the time remaining in this season. The rest of the trench is nearly done, however, so I'll continue to assign workers to the back in the hope that some significant progress, at least, can be made.
Loci 23 and 32 were closed today, and 33 was opened.