The work day was spent excavating locus 1 (topsoil). My crew is working slowly but surely. The goal of the SLT12 operation is to fully expose at least the first course of the the stone walls. This should be doable within the 4 days that are left of the season.
So far I've filled one bag of ceramics from locus 1, and the topsoil isn't even completely removed yet.