Search
Log In
Code
ICL03.01
Season
2003
Narrative

Beginning dissertation fieldwork today by prospecting at a possible LBA structure deemed ELT-1 (East Lower Town 1). We laid out a 1.5x3.8m trench along the west wall from the SW corner. We began just before lunch, so we finished the topsoil and came down on a substantial boulder in the middle of the trench.