Today I photographed SLT12 and drew its floorplan. I also took "final" elevations for all 4 loci in operation (loci 2, 3, 4, and 6). Future excavators will be digging through the tops of most of these loci (except for locus 2), as operations mostly involved locus 2.
Note: these are not final photos or drawings, as work at SLT12 is roughly a week old.
This concludes my summer 2011 journal entries.