7.29.13 The workers had to the take the shovels to a welder to prevent the metal part from falling off. It was hot starting in the morning. When I arrived at the site, I noticed cow poop throughout the site. It seems we are in the path of the cows. We mapped a third trench today which Lori will begin digging and Elizabeth F. will finish. The trench is WSDB. The WSDA2 workers are Roman, Ara, Narek, and Vartan. I found a small find, possibly a polishing stone. I went over it with Lori and Ruben back at the house. It was found while removing sod. We determined it was not worth keeping. After lunch, we continued removing the sod and decided where to put the ramp. We put it along the South East wall of the trench. Perhaps the wall going through the middle of my trench is the back wall of the room? I have to work on keeping the workers active and not idle. Two of my workers today were subs and young. They tended to need more prodding to do work. We finished removing the sod, but still need to do some more cleaning of rocks. Then we can close Locus 1.