Weather: It was a sunny day with a little bit of wind. It was hot.
Workers:
1- Gregor
2- Karem
3- Harmand
4- Roman
5- Rolland
6- David
7- Arthur
We had open a new trench today. It called T35. First of all, we had to sod the top of the trench, so it was the locus 01 that we had to remove. After that, we had to give to the trench a flat level. Then, I separated the trench in two locus : 02 (the east part of the trench which is actually really high) and 03 (the western part of the trench wich is at the rigth level to start to dig). After 70 cm deeper, the locus 02 was not at the rigth level. We will finish this tomorrow.
For the trench 34, Lilit, with Karem, had to draw the structure completely, before removing the clay floor and the rock which surrounding the feature 2. This was an hard day, because shoveling was long. I knaped a little bit to pass the time. A lot of sherds and bones were already found. A little bit of obsidienne were found to. I was not keepind the bones for this layer because it is not an archeological soil.