Weather: It was a cloudy windy day.
Workers:
1- Harmand
2- Karem
3- Rolland
4- Zarzand
5- Gregor
6- Roman
7- Samvell
In the trench 34, we had to finish the digging in the locus 102. We wanted to find the pavement of flat rocks. We wanted to know if it was every where in the structure. Finally, the pavement is not every where. In the feature 2, no rock was found, maybe because this feature is a pit. We have to dig it after the drawing will make. We have to dig into the feature 1 and 4. Some stones were remove, and we found a pattern: 5 loops were rest on the bed rocks and tree of this loops have pavement at its bottom. Ruben think that maybe those loops were built to put water in it: maybe this structure was an enclosure for small animals. The right wall of the structure is not built on the pavement, it was built on a earth base. A large rock exceed the wall, but I do not know why.
In the afternoon, Adams and Ruben helped me to take measurements to open a new trench. The workers only had the time to start to remove the sod.
Today was Rolland\\\'s birthday