Season
2013
Narrative

Weather: It was a sunny day, with some cloudy moments and with a lot of wind.

Workers:
1- Harmand
2- Karen
3- Rolland
4- Romand
5- Zarzand
6- TiGrand (He was only watching us int the morning and he was absent in the after noon).

I had to learn quickly some armenian words, because it was very hard to understand my workers if I do not speak to them in armenian.

Today, we had to remove the stones which protect the archeological wall (the right one of the structure) and the refill soil (remblais). The refill soil was suppose to be between 10 to 30 cm deep. Surprisingly, the refill soil was only 5 to 10 cm deep. We, actually, had the time to finish removing the locus 100 today (Z: 120 cm). Also, Adams and I had take the new elevation spot (2296.644).

It was fun today, because we had already find some artifacts : shreds, bones, one or two obsidian and a fragment of a mortar