Search
Log In
Code
CG.13.13
Season
2013
Narrative

Weather : It was cold in the morning, still very windy. It had sun with a lot of cloud. In the afternoon, it was so windy again and it was so hot and humid, no clouds anymore. We had to move to T31 in afternoon.

Workers :
1- Roman
2- Rolland
3- Samvell
4- Karlos
5- Gregor * He was missing in the afternoon
6- Zarzand *He was missing in the afternoon
7- Arthur (Zarzan’s brother)

In T35, we wanted to finish the locus 05 and 07 and maybe found a EB floor, why not. I made a sondage 50 cm X 50 cm to find what is happening under the washed layer. After 15 cm, it is still washed layer. I took a sample of a charcoal, just in case. I don’t know if I will take it after checking it again. I don’t what going one wet in this part of the trench 35.

For T34, We wanted to finish locus 108 and to the locus 105. A trowel was broken today.

For T31, Adams and Ruben wanted us to extend this trench with 3 meters with the shuffle first and with the trowel after. We wanted the trench very clean for photos and for the arrival of Catherine in Gegharot. Then we had to remove all the plants and the washed layer (locus 100). We wanted to know too if there is a bronze wall in the3 southern-eastern part the trench.