Search
Log In
Code
LA14.01
Season
2014
Narrative

We started the excavations on the trench AB 4, which is on the east slope of the Aragatsi Berd hill. It has south-east and north west position, and 10x3 m dimensions. The trench was devided to two parts, and we are continuing the work in the south-east one, which was excavated during 2006-2008 years. The first day we started the cleaning of the trench, as it was full of stones and soil, which is result of conservation. We started the work with 3 workers.