Search
Log In
Code
AC16.05
Season
2016
Narrative

Opened a 1x1 at Aparani Berd. Going to open up a series of 1x1s going at an east west transect in order to understand how the terracing works. This first trench Operation 4A is at the most eastern boarder of a lower terrace. After opening up there appeared to be rock fall on the surface with limited supporting structure. Decided to push the 1x1 west in order to understand the rocks formation. Went down with shovels 20 cm at a time. Removed some rocks that did not appear to be associated with architecture. Finding mixed context with pottery from the EB, Iron Age and LB. Due to rain we ended work early.