Search
Log In
Code
MM16.08
Season
2016
Narrative

Today we managed work for a whopping 30 minutes before rain started. RB, AH, and LM came out (I had no idea); I assume to see if/when it would be ready for LTM to draw. We got started on expanding the trench 50cm on the N-E part of the trench to expose the rest of the cromlech.

The rain is so VEXING! 2 good days with dry soil and we would almost be done with locus 2.

At home, LA, SW, and I cleaned the rest of the juvenile skeleton from Aknashen that LA is working on. After lunch, we coded it using paper forms, including inventory, dentition, epiphyseal presence/fusion, age, and measurements. We still need to photograph it. 4 +/- 2 months. LA and I went through most of the forms and recording (he is getting better at it) and SW observed and asked questions.All those freaking unfused neural arches took forever to sort!