Search
Log In
Code
ICL05.12
Season
2005
Narrative

Still in locus 2 wash layer in SLT5. The domestic wall from SLT1 seems to be emerging in NW corner of operation, but is just cutting across the corner. Didn't change locus number since the top of the wall is coincident with the beginning of locus 2 and the entire operation so far seems contained within the architecture. Should hopefully get a nice view of the domestic floor.