A sunny warm day!!
This morning Arshot came out and took drone photos of both cromlech tombs. I then took photos from the ladder. Vahe then went with Arshot to help drone for the rest of the morning.
I got SW working on locus 07 within the chamber in T01 Burial 01 (locus 5).
In the other cromlech (Burial 02) LA and the rest of the team worked on the large tuff capstone. We first had to remove the overlapping basalt rocks (locus 6 is the entire cromlech surface structure) and soil beneath (locus 8). I took measurements of the removed stones. We then cleaned it up, took more measurements of the capstone and elevations. I wish I had had time to draw the cromlech. Lilit of course has it, but it is so much more useful to have it in my notebook. Since there were not enough people to open a new trench I also took photos in addition to measurements... and that was about it.