We will continue to dig locus 5 today. With the dense LB deposits at the end of yesterday, it is hoped that the locus will continue to be highly productive.
Incredible material densities in the SE corner have opened the possibility of extending the trench in this direction.
With the majority of NT2 dug to bedrock at days end (except locus 6), we opened an extension to the trench. It is located off the SE corner, adjacent to the dense ceramic deposits in locus 5