Search
Log In
Code
SW16.18
Season
2016
Narrative

Today we continued cleaning the western part of the trench for drawing. At the same time, we began to move the cobbles from the locus 4 and almost finished this process. Besides, we began to digging locus 3 and the capstones of the eastern cromlech have exposed after the cleaning. At least three capstones were located above the chamber and several faced stones were circled the capstones.