Today was a great day in T38 -- the mojo lives on! As we continued to excavate and clean the 2017 northern extension of the unit we uncovered a bronze point (or arl). While this was resting outside the enclosure (and not on a floor surface) it is nonetheless exciting especially amidst a day of cleaning the trench to expose existing architecture. I anticipate that in a few days the unit will be photo ready -- once the extramural areas are leveled with the interior of the unit.