Search
Log In
Code
SB17.17
Season
2017
Narrative

Today we continued our work at Mirak Operation 03. Although we took the trench down by over half a meter today, we remained in Locus 03, without any architecture or soil change to justify a change in Locus. This Locus has yielded quite a bit of ceramics (1.5 bags so far) as well as many animal bones (possibly part of a lower boar mandible). All of my workers were lovely today. Tomorrow we are planning on expanding the trench to the south just enough to clean off the top of the fortress wall well. We will also continue digging down tomorrow until we hit something interesting or bedrock.