Today we finished removing the topsoil from the new extension along the W side of T46. We confirmed that the group of stones uncovered in the SW corner continue in the shape of a wall running in SE-NW direction. This wall (Wall 2, Locus 15) appears to be parallel to W1 and form a system of terrace walls with the latter.