It was a very windy, dusty day today, making it very difficult to work. In C10, we continued to excavate locus 5, where we found a spoon/crucible. As we excavated locus 7, we encountered several rocks that seemed to constitute small constructions. We created two new loci - 8 and 9 - to demarcate these constructions. However, as we continued, we realized that these were fallen rocks. So, loci 8 and 9 were collapsed back into locus 7. In digging locus 7 we exposed another course in the wall that runs ne to sw. Today Adam and I also drew the section of the se baulk in C7.