A productive but tiring day. Adam was in Tsagh and we spent much of the day cleaning old trenches for final photos. We took final photos in WSC, WSC2, and WSE. We also drew the section of the SW baulk of WSC2. Continued to excavate locus 1 of WSL and started a locus 2 in WSK, which is marked by a medium brown silt. Note that today I deleted operation WSJb and made those loci WSJ b01, WSJ b02, and WSJ b03.