Today we continued to work in T16A and T16B. We had no nasilka so we were working with buckets and trowels . We have managed to clear some of the rocks pilled up between the two trenches, but there is still a lot of work to do. Artyom was working on the eastern edge of T16A to bring it down to the rest of the trench. The burn layer appears to be localized to the center of T16A for now.