Search
Log In
Code
LMP.17
Season
2005
Narrative

We continued to work on defining the center wall between T16A and B. I worked primarily on the southern section. Right before lunch we found a wall that lines up perfectly with the wall in Alan's trench (north wall). I removed a lot of rocks from the center of the trench. The boys were taking down T16B another 10cm.
After lunch Maureen came and helped clean off some of the eastern section of T16A (the neverending collapse of rocks).