In area C, work continues in locus 6, after a field trip to Lauren's trench to ogle her bulk + some bulk cleaning.
In area A, after finishing locus 3, we've moved on to locus 4, which is a trench wide change to sandier soil.
Work proceeds well with my 8 workers.
A half circle of stones intersecting the south bulk appearing in A4. Perhaps a wall. Inside the wall(?) will now be a new locus (A5).
Half a mortar found in A4/A5. Also a strange stone with bumps.