Lori in Yerevan so had 3 of her workers exposing the southern face of the southern most wall in SLT5. Also cleaning out west baulk of SLT1 in preparation for taking out the SLT4/SLT1 baulk. In SLT5 we started locus 17 below topsoil along southern most wall.
Still cleaning stones and digging down in locus 6 of ST2 when we found fragment of iron point in topsoil surrounding some stones. (Ar/Ts.ST2.5.M.1). Also cleaned off the face of the wall abutting the 'gate' wall which runs down as far as the gate wall.