Today's work involved the completion of the E552 floor clearing, leveling, and vessel collection. Perhaps ten or more vessels are involved with this EB area in the trench's southeast corner. In E539 we defined a bedrock pit below floor E540 and pulled an LB karas that was still in the pit (E576), below the shrine occupation. Final measurements and photographs were taken.