Last day in the field. Took pollen samples on SLT5 locus 5 floor every 50cm. Also took floor sample in cloth sack, and stumbled across a pit against locus 19 wall. Pit was lined with clay and contained a nearly complete handmade cooking vessel. Took a few samples of pit lining since there were macrobot impressions. Hasmik finished her measurements.
Also took large soil sample from SLT4 locus 14 burn feature.
Swept down and took final photos of ST2 and drew plan.