Search
Log In
Code
LK05.29
Season
2005
Narrative

All workers worked in WSL today on three main tasks. First, we finished in the pit which, once locus 12 reached the level of locus 7, I took down to the bottom as locus 13 across the entire trench. Second, I extended 3 meters to the NE to try and expose the top of the wall. It looks like there's a gap between the wall of room L and that of the next room to the NE, but too soon to say what's going on for sure. This area has been locus 14 and 15 so far. Finally, we moved the large boulder from the west corner and began excavating a 1 by 1 meter trench in that corner to see how deep the clay and plaster floor is and what is beneath it. This is locus 17.