6/17/2006The first part of the day was spent removing the rest of the turf from the entire operation of WSH. After removing the turf, a few lines of rocks were already visible, so I decided to divide the trench into a few sections and change locus before excavating the first wash level. The main part of the trench--the area which squarely belongs to room H according to the surface architecture--became locus 2. The area of the trench that is just outside the southeast wall became locus 3. The sliver to the southwest which is bounded by a row of rocks and appears to belong to room D, will become locus 4. Spent most of the afternoon working in locus 2 and locus 3.