Search
Log In
Code
AFG.06.04
Season
2006
Narrative

Today's work involved (1) the completion of a specialized collection of locus E613 sherds from the E618 floor which were two friable and unstable to be conventionally collected and washed and (2) the continued cleaning of the E615 and E617 loci surrounding wall locus E616. The removal of wall fall cobbles has shown that the wall continues south to the southern trench wall. Additional cobbles within locus E617 may constitute a new architectural locus, but this remains unclear. E615 seems to have descended onto and EB building trench for wall locus E616.