Search
Log In
Code
EF06.05
Season
2006
Narrative

06.21.06 After being ill for 2 days went back to work on T16 at Gegharot. Also opened new trench, T19, just to the north of T16. Workers battled breaking shovels to remove roughly 1/2 of the topsoil, from the western/downhill side of the new trench. One bone, maybe two ceramic pieces. In T16, life was more exciting. Avo and David revealed more of the EB wall, T16.106, and Razmik and Tigran found very many ceramics in locus 104, which RB believes are nearly all EB. Loci 108 and 109 went largely untouched. I worked on Locus 102, the 1-meter path along the eastern side of the trench, with the clay feature. Worked the south half of 102 entirely to the gravely bedrock, cleaned up around the clay feature, and also made the NE corner cleaner for better analysis of oddly-deep destruction level around that corner.