Search
Log In
Code
AFG.06.18
Season
2006
Narrative

This morning began cool and clear as we continued to clear soil (locus E647) from the linear stone construction emerging in the NW quadrant of T2E and from the southern trench wall section. The emerging wall lengthened all day as we removed soil in 10cm shovel passes and cleaned the stones with trowels. With T19 excavations out of action for rock clearing we were able to use a wheelbarrow for quicker dirt removal. By day's end the stones stretched from the northern trench balk to the northern border of the locus E609 EB wall pedestal. In the south section excavations we continued to removal soil from locus E656 down to the black loamy lens near the base of excavation in the trench