Second day of excavation. All trenches are now defined with the sod layers removed. All are progressing with varying degress of rapidity through the wash layer. Material densities are medium to high in most operations. Trench NT 3 is closed today as Belinda is home working with the animal bones. Her workers have been added to the team working in trench C3.