Search
Log In
Code
MEM.06.28
Season
Narrative

07/21/06.Set up trench w/in trench in Burial 3 locus 6(3.5x4.5 m) and began to reomove loose dirt. Also screened this locus and hound some bone, animal I think.Burial 2: continued claering out loose dirt and then worked on levelling it.Burial 4: I finished drawing it at the end of the day. Still need to take elevations of cromlech.Got very frustrated at the end of the day because younger workers were goofing off, everyone working slow, and the giant craters don't look any better. Realized that my workers have not really been excavating... just cleaning rocks. Had LK come over after lunch and explain in Armenian how we needed to make verything level, straighten the walls, not step on the sides, work away from the walls, etc. Then everyone was very quite. More lessons tomorrow.