Search
Log In
Code
MTM.06.39
Season
Narrative

8/9/06, There hasn't been much time for notes. We're so busy trying to finish up the trench--cleaning and removing rocks, drawing, etc. So much to do! The daily plans have been somewhat abandoned due to the interest in drawing the final plan. Since at the point the two will closely resemble eachother, it is not at much loss. I've spent the whole day drawing. Three people have been helping me with the measurements. The other guys have been taking away dirt from locus 28. The end of locus 28 was expanded to see the andiron, it is now at 3.75 meters from the East edge of the trench.