Search
Log In
Code
MEM.06.45
Season
Narrative

08/11/2006.B4-we spent the morning filling the skeletons with dith, plastic, dirt, and chunks of topsoil. Not to mention a metal construction that my workers put together. Artur brought his tools and we worked on breaking the rock, it went pretty well, temporarily slowed down by the need to repair the sledge hammer. Then dug down with shovels until we found bone... covered that up for the night.B3-in the interim of fixing the sledge hammer, we took the depths for the section of burial 3 and I drew it. B2-backfilling. Geologists came to visit today and agree that if there were a chamber in burial 1 it should be under the large rock in the east... but still, we excavated a part of it and didn't find anything.