06/26/08 A beautiful day for the start of a new season! Started a new operation today in room D (WSD). We only worked half a day, and in that time began removing topsoil. WSD will connect the previous excavation areas into a single, continguous architectural complex. It should hopefully also clarify the doorways between G and D and between D and C. But this is a large trench, and I'm not sure it can be fully excavated in the time avaialble. After removing topsoil, I will divide the operation in half and see how it goes from there.