First day of fieldwork. Everyone went to Gegh in the morning for an orientation of previous work. After laying out current trenches, the Tsagh crew, Adam, and Ruben went to Tsagh to lay out trenches. Not much happened before lunch. In the afternoon, I began to lay out a 1 ha grid for the magnetometry survey using the total station. We used the resection and stakeout functions on the total station to lay out the grid into 20x20m blocks. By the end of the day, I laid out the baseline and the first couple of lines with Adam's assistance.