Narrative

Morning:
Busy morning.
C3: Yesterday, RB and TTT expanded area A 2m west to define wall. Interior face also has excellent masonry but needing more room to find the interior floor, we expanded both areas A & B a total of 3m. In B we have a number of small walls that are high up in the strat but blocking our way. Expansion should give us room to work.
NT1: did final photos. Hasmik now drawing.
ET1: excavation continuing through wash but we have located a wall in the N balk. Looks LB.
Afternoon:
C5: took photos of floor in SW area (below upper wall). Now continuing down.
ET1: Found what we think is floor
Evening:
Read A ceramics. Now more convinced that wall in A and B is LBA.