RB in Yerevan. PA, ATS at Tsakahovit.
Morning rounds:
ET1: Working through layer of dense rubble and hoping to define walls.
C3: In area AE, defining top of wall and continuing down against interior face. Several large rocks against face limit where we can go down. In area BE, doing same. In area D, defining stone floor and searching for interior face of wall.
C5: Almost finished cleaning 2 3m sections of wall. We are almost finished with this trench although we may try to bring down one small area to LBA floor.
Afternoon:
ET1: